Build it in the right order
Roof Raiser
Put the roof on in the right order. Skip a step and it leaks — same as real life, just cheaper. Drag a card onto the roof, or tap it.
- Leaks
- 0
- Score
- 0
Your roof
Steps (in the wrong order, on purpose)
Built so far
Step order reflects Florida Building Code re-roof practice and Indian River County inspection checkpoints (sheathing → dry-in → flashing → in-progress → final). A game, not a permit.
Why this exists
You cannot judge a contractor if you do not know the order.
A roof is eight steps and five county inspections. A house is ten steps and five more. Most people only ever see the first day and the last day. Now you have seen the middle.
Every leak we get called out to started as a skipped step. The membrane left off because the shingles were already on the truck. Drywall hung before the inspector saw the wiring. A roof-over on wood that should have been replaced.
The order is not our opinion. It is the inspection sequence the county requires, and we build to it on every job.
Ready for the real thing?
Plan your project in about five minutes.
Pick the type of work, answer a few questions, sketch the space if you like, and book a time to talk. No pressure, no spam — written follow-up from a licensed contractor.
Florida Certified Building Contractor CBC1253676. Vero Beach · Sebastian · Fort Pierce · Port St. Lucie · Fellsmere. Bilingual company. Hablamos español.